The Pacific Mistral recently completed its customer requested upgrades and modifications and commenced operations in Brazil on February 6, 2012, under a 3 year contract with Petrobras.
Pacific Mistral
- Samsung 10000 design capable for operations in 12,000 ft water depth
- Equipped for 35,000 ft drilling depth
- Maximum 37,500 ft drilling depth
- 200 man accommodation
- 20,000 MT Variable Deck Load
- Enhanced single activity with offline stand-building
- Four HP pumps 7,500psi
- 15,500 bbls liquid mud storage
- Increased thruster capacity and hull-strengthening to expand operating envelope
- Outfitted with multipurpose lowering cart for X-tree hang off
Download Detailed Specs
View our Fleet Status +