Pacific Khamsin

Construction of the Pacific Khamsin commenced in Fall 2011 at Samsung Heavy Industries in South Korea. Delivery of the rig is expected the second quarter of 2013.  Following mobilization, the rig will work for Chevron in the Gulf of Guinea under a two year contract.

Pacific Khamsin

  • Samsung 12000 design capable of operating in 12,000 ft water depth
  • Equipped for 35,000 ft drilling depth
  • Maximum 40,000 ft drilling depth
  • 200 man accommodation
  • 22,000 MT Variable Deck Load
  • Dual derrick with 1250 ST Main and 1000 ST Aux load paths
  • Main rotary 75.5”, Auxiliary rotary 60.5”
  • Two each Active Heave Drawworks and TDX-1250 Top Drives
  • Racking capabilities up to 20” casing
  • 29,200 bbls liquid mud storage
  • Seven HP pumps 7,500psi
  • Dual mud system, dual gradient drilling capable
Download Detailed Specs 
View our Fleet Status +
Operations
Design by Mentus